I. Preparation Before Installation
1. Site Selection
-
-
- Choose a well-ventilated, dry, flat area with sufficient load capacity to install the liquid nitrogen freezer. Avoid damp, high-temperature, or corrosive environments.
- Ensure there is enough space around the site for operating, maintaining the equipment, and storing and transporting liquid nitrogen.
2. Equipment Inspection
-
-
- Before installation, carefully check all parts of the liquid nitrogen quick freezing machine to ensure they are undamaged and complete, with no transport-related damage.
- Verify that the equipment's model, specifications, and technical parameters match the purchase contract.
3. Tools and Materials Preparation
-
-
- Prepare the necessary installation tools, such as wrenches, screwdrivers, and pliers.
- Gather required installation materials, including sealants, washers, and cables.
4. Safety Gear Preparation
-
-
- Installers should wear appropriate safety gear, such as hard hats, protective gloves, and safety goggles.
II. Installation Steps
1. Positioning the Equipment
2. Connecting the Liquid Nitrogen Supply Line
-
-
- Connect the liquid nitrogen supply line to the equipment's nitrogen inlet, using suitable seals to ensure a tight, leak-free connection.
- Before connecting the line, make sure the inside is clean and free of debris.
3. Electrical Connections
-
-
- Follow the electrical schematic to connect the power cable to the equipment's power interface.
- Ensure the electrical connections are secure, properly grounded, and meet safety standards.
4. Installing the Ventilation System
-
-
- If the equipment requires a ventilation system, install it according to the provided instructions to ensure proper airflow and the timely removal of nitrogen gas produced during operation.
5. System Testing
-
-
- After completing the installation steps, conduct system testing.
- Check that all connections are secure and that there are no loose parts.
- Test the electrical system to ensure it functions correctly.
- Test the liquid nitrogen supply and freezing system to check the freezing performance and nitrogen usage.
III. Post-Installation Inspection and Acceptance
- Visual Inspection: Check the equipment for any damage, deformation, or paint peeling.
- Leak Check: Use a leak detector or soapy water to check the nitrogen supply line and other connections for leaks, ensuring there are none.
- Operational Testing: Run the equipment for a while to observe its operation, including temperature control, pressure readings, and operational sounds.
- Performance Acceptance: Based on the technical parameters and performance indicators, verify the freezing speed and effectiveness to ensure the equipment meets usage requirements.
IV. Precautions
- Follow the installation manual and relevant standards strictly during the installation process; do not change steps or methods without approval.
- Installers should have the necessary professional knowledge and skills, familiar with the installation process and safety precautions for liquid nitrogen freezers.
- If any issues or abnormalities arise during installation or testing, stop work immediately, investigate the cause, and resolve the issue before continuing.
- After installation, provide users with a detailed operating and maintenance manual and offer necessary training.
SPEEDCRYO provides on-site installation services, including:
- Site inspection, planning, and technical proposal services before equipment purchase;
- On-site installation, debugging, and trial operation guidance after equipment arrival;
- On-site operation guidance;
- Guidance for installing liquid nitrogen tanks and pipelines;
- Guidance for exhaust pipe installation for the liquid nitrogen freezer.
If you need our professionals to provide site planning services before purchasing, feel free to contact us; it’s completely free!